Plaza El Terronal Phase II
Nov 10th, 2009 by Don Ray
The second phase which includes Conway is making a lot of progress as you will see in the following photos.
The parking areas are being cleaned up. Here is the ramp going to the bottom area parking.

The area to the right of the pickup is supposed to be a wine store.

The area tho the back of Movistar has had the parking area improved a lot since my last time here.

A Digicell store is nearing completion to the left of the Subway restaurant.

It is currently the 10th of November. Many of these stores are still planned before Christmas. We will see.




I believe this will be an advantage when finished, BUT, I hope they put in enough of a drainage system to accept the heavy rains in Panama. Sometimes, the necessities are forgotten with construction. We still are ankle deep in water going to our car after shopping during a rain. Accepting Panama is wearing tongs rather than shoes and, American “socks”.
Hi Charlotte. We should know soon. I wear different shoes in the morning, when it is usually dry, than in the afternoon when it normally rains for the reason you mentioned.
I am looking forward to this passe of Plaza El Terronal opening.